AR# 30043

10.1 Timing Analyzer - Cross-probe correlated path to tech view is empty

説明

It always happens to a partition design which has PERIOD path. Cross-probing paths from the timing report to the translated (correlated) technology view results in an empty schematic.

ソリューション

This problem is scheduled to be fixed in the next major release of the design tools.

AR# 30043
日付 05/22/2014
ステータス アーカイブ
種類 一般